Big lift at shipyard

 

Word is that the overhead cranes will be installed at the shipyard this week. The Kone overhead cranes were delivered to pier 9 last week.

Irving has two of their largest cranes, A
Liebherr – LR1400 440 ton in the foreground, and a MANITOWOC – M-2250 300 ton, to lift the assembled cranes and put them into place. The overhead cranes themselves span the width of the ultra hall and are 200ton capacity each.

 

Leave a Reply

Your email address will not be published. Required fields are marked *