Author Archives: Peter

About Peter

is a Blogger. Photographer. Longshoreman. IT Guy. also the brains behind HalifaxShippingNews.ca and BuiltHalifax.ca Personal site ziobrowski.net

CBSA Container Inspection Facility

Progress continues on the new container inspection facility for Canada Border services, on Africville Rd. next to the Fairview cove terminal. Currently container flagged for inspection are trucked to their facility in Burnside.

The future plan has Fairview Cove handling the majority of truck traffic for both terminals, with container moving by rail between the terminals. CN already operates an inland terminal in Moncton to handle regional containers, and are interested in developing a facility in Debert

Its Hammer time.

Orion looked to be testing the hammer used to drive piles into the seabed. The Crane has positioned the hammer over the pile stabilizer which keeps the pile in position while the ship is dynamically positioned.

(Below)GPO Grace remains at anchor

sorry, couldn’t resit the headline

Guyot heading back to Europe

Guyot, a IMOCA 60 competing in the Ocean Race was bound for Newport RI when it was demasted in a storm. The boat made its way to Halifax after taking fuel from a container ship, and under a jury rig.

The Boat was hauled out this afternoon at Fairview Cove, and placed on a mafi, to be shipped back to Europe for repair. Given the placement on the mafi, it will likely go be shipped via ACL

BBC Arizona with plane parts

BBC Arizona arrived at pier 9 to offload Airplane parts from Belfast. Componenets for various Bombardier aircraft are manufactured in a facility in Belfast, then shipped to Halifax, to be trucked for final assembly at facilities around Montreal.

These parts normally arrive on ACL vessels, so there may have been a scheduling conflict, or a lack of available space.

Given a Vessel the size of BBC Amazon could comfortable reach Montreal, it is prehaps curious parts still flow through Halifax via ACL.

GPO Grace with pieces.

The GPO Grace arrived on Saturday with Piles and transition pieces for the Vineyard Wind 1 project. The ship brought 6 sets, and tied up next to Orion.

On Monday the ship moved to anchor having transferred one pile and transition piece to the Orion.

No other movements are listed for either ship, so its unclear if Orion will load more Segments before sailing for installation

A foray into Video

Halifax Shipping News has had a YouTube channel for a number of years now. But nothing was ever really done with it. I’ve decided to make a short explainer video on the Orion. If you like, Please like the video and Subscribe to the channel, and ill be sure to make more.

There is Some neat old stuff, such as the launches of two the Coast Guards Midshore patrol vessels. Check it out. the grainy stuff was shot on a Sony Mini DV Handicam.

A Time lapse at Fairview cove (below) shot on an iPhone5

And arrivals of other vessels. Check out the channel at https://www.youtube.com/channel/UCUr0OKTMkpaIqqmCLsXTmrA

More Orion

The Original Orion post detailing the ship and the project it is working on can be found here

The Top of Orion’s crane is over 400′ tall. One commentator Noted they could see the top of the crane from their house, 9km away as the crow flies.

Staging work continues, A large Crawler crane has arrived.

HMCS Windsor on the lift

One one submarine based in Halifax is out of the water again for a work period. HMCS Windsor has been up on the Synchrolift for the past couple of weeks. The Shed behind the synchrolift is specifically designed to accommodate a submarine, so its unclear why the boat is not inside. This might suggest minor maintenance, rather then something more serious.

Sunday Happenings

(Above) the Tanker Acadian at Anchor in the Inner harbour. (below) MSC Shay in Anchorage 1 for Asian Gypsy Moth Inspection. the ship moved to pier 41 when MSC Japan Sailed.

While MSC Shay was at Anchor, the PCTC Bess departed from autoport (Above)Offering a nice size comparison of the two ships as they passed.(Below)

The Atlantic Elm was also tied up at COVE along side the Barge Atlantic Marlin

Endurance at pier 27

The General Cargo Ship Endurance arrived from Cuba, and tied up at pier 27. Lacking a Significant load of Containers, its likely loaded with Nickel Sulphide “mud” . The ship is likely an extra, as it does not appear on Nirint lines Schedule.